Pure worked with the client, architect and consultant from the outstart of this project to keep to tight deadlines for this medical facility in the centre of Papatoetoe.
The first floor was totally stripped out before anything was reinstated. There were problems with drainage to be overcome and structural upgrades required to make the building safe.
The fitout is progressing well while the exterior canopy, tiles and gardens are taking shape.